2013 |
Yan-Chun Chen*, Optimal Production and Inspection Strategy with Inspection Time and Reworking for a Deteriorating Process, International Journal of Operations Research, 3, 10 |
2013 |
Shey-Huei Sheu*, Chien-Kuo Sung, Tsung-Shin Hsu, Yan-Chun Chen, Age replacement policy for a two-unit system subject to non-homogeneous pure birth shocks, Applied Mathematical Modelling, 6, 37 |
2013 |
Chien-Kuo Sung, Shey-Huei Sheu*, Tsung-Shin Hsu, Yan-Chun Chen, Extended optimal replacement policy for a two-unit system with failure rate interaction and external shocks, International Journal of Systems Science, 5, 44 |
2013 |
Shin-Guang Chen, Bayesian approach for optimal PV system sizing under climate change, Omega, 41, 2 |
2013 |
Chiu-Tang Lin, Evaluate the Performance for Regional Diversification Models of Firms Competitiveness, Advences in Information Sciences and Servies Sciences, 5, 6 |
2013 |
Yan-Chun Chen*, An optimal production and inspection strategy with preventive maintenance error and rework, Journal of Manufacturing Systems, 32 |
2012 |
Shin-Guang Chen and Yi-Kuei Lin, Search for All Minimal Paths in a General Large Flow Network, IEEE TRANSACTIONS ON RELIABILITY, 61, 4 |
2012 |
Shin-Guang Chen, An optimal capacity assignment for the robust design problem in capacitated flow networks, Applied Mathematical Modelling, 36, 11 |
2012 |
林成益,巫龍章,陳慈慧, 應用EWMA方法組合多國股價指數的波動幅度來預測台灣加權股價指數, 東南學報, 37 |
2009 |
P.C. Wang.Ya-Hui Lin. Yan-Chun Chen. Jen-Ming Chen, An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length, International Journal of Systems Science, 10, 40 |